Skip to main content

Overview

The Naromine Solar and Battery Energy Storage System (BESS) is a 150 MW solar and 150 MW / 300 MWh utility-scale project located in Naromine, New South Wales. Pairing large-scale solar generation with battery storage, the project is designed to deliver clean, reliable power to the grid and support New South Wales' growing renewable energy capacity. Originally developed by CleanGen, the project was acquired by ACE Power in 2023.

CleanGen acknowledges the Wiradjuri people as the Traditional Custodians of this Country and respects their deep and enduring connection to this land.

Details
  • Solar150MW
  • BESS150MW/up to 8 hours
  • LocationNarromine, NSW

Project Timeline

  1. Stage 1 / 5Site Selection
  2. Current StageStage 2 / 5Development
  3. Stage 3 / 5Ready to Build
  4. Stage 4 / 5Construction
  5. Stage 5 / 5Operations

Impact

300MW

Wind, solar and battery project pipeline

50K+

Homes to be powered

120+

Jobs

298K

Carbon offsets

$600M

Investment opportunity